5G Smart Train Station (Zhuzhou Station)
Guangzhou Railway Zhuzhou Station has a total of 11 platforms, with 8 ticket gates corresponding to each platform in the waiting hall. It is designed to accommodate up to 5000 people waiting at the same time every day, with a peak daily passenger volume exceeding 21000. The comprehensive station adopts a combination of line side and line up design, with the station building consisting of two sub stations, east and west, and an elevated waiting room. Integrating the design concept of "Xiang River surges and connects the eight directions", we strive to create a brand new landmark station that integrates various elements such as railway transportation, Yan Emperor culture, ceramic capital, Xiangjiang River bank, and rail hub.
The station is equipped with a foolproof gigabit 8-optical 2-electric access switch X3182, a network managed 24 optical 4-wire aggregation switch X51244, a 5G wireless router XWP101Q, and a Huawei 5G indoor digital system to jointly build a 5G wireless network. This enables 4K high-definition feedback for station security checks and video surveillance, providing high-definition video calls for waiting passengers and assisting in the construction of a 5G smart train station.